Technical FAQs

Ask a Question

Is factory installed bus or conductors provided for the second field installed Service Disconnect on ALL the 400amp CSED?

Issue:
Product Design Features

Product Line:
Combination Service Entrance Devices

Environment:
Field installed Service Disonnect

Cause:
Installation

Resolution:
The appropriate bus or conductors that would be required from the load side of the meter socket to either the Service Disconnect base or factory installed lugs, will be factory installed. Depending on the exact design layout of the 400amp CSED, it might require the installer to field install conductors from the lugs or base to the Disconnect once it is field installed.



 
Was this helpful?
What can we do to improve the information ?