Technical FAQs

Ask a Question

Video: How does the neutral get bonded to the enclosure, for Service Entrance Applications, in a High Amp(150amp and above) QO or HOMELINE load center?

Issue:
Product design feature

Product Line:
QO and Homeline load centers

Environment:
Box Bonding

Cause:
Application

Resolution:
NOTE:
All QO and Homeline load centers that are marked 'Suitable for Use as Service Equipment', will come from the factory with a Green Neutral Bonding Screw, to be installed when the load center is used in a Service Entrance Application.

Refer to the Wiring Diagram Label of each load center, the label will be located on the interior sidewall of the enclosure. The Wiring schmatic will state "Box bonding when required" and indicate the location on the Main Neutral Assembly of where to install the green bonding screw. The green bonding screw, is a Form Threading(or self-tapping) screw and will require a small amount of force to get the screw started in the hole of the enclosure. SEE THE BELOW VIDEOS. 

REMOVE BOTH OF THE EXISTING VIDEOS BELOW AND INSERT NEW VIDEO
QO Load Center Neutral Bonding Screw:


Homeline Load Center Neutral Bonding Screw:
Was this helpful?
What can we do to improve the information ?