USA

Schneider Electric USA Website

Welcome to our website.

To view product availability in a specific country, select from the country list below. For Investor Relations, please visit our global site.

Choose another country or region

Selective Coordination vs Arc Flash Requirements

This document is current but may reference obsolete products.
  • Document Number

    0600DB1303

  • Type

    Data Bulletin

  • Languages

    English

  • Date

    06/07/2013

  • Version

    1.0

This document is current but may reference obsolete products.
Download
  • Document Number

    0600DB1303

  • Type

    Data Bulletin

  • Languages

    English

  • Date

    06/07/2013

  • Version

    1.0

Add to my Documents

Description:

This conflict between selective coordination and arc flash is explained in this paper through real world examples. This paper also discusses the two levels of selective coordination commonly employed.

Product Ranges:

LA/LH Mission Critical Circuit Breakers, PowerPact Q-Frame Molded Case Circuit Breakers, PowerPact L-Frame Molded Case Circuit Breakers, PowerPact H-Frame Molded Case Circuit Breakers, PowerPact J-Frame Molded Case Circuit Breakers, Masterpact NT and NW - UL/ANSI, E-Frame Circuit Breakers

Files for Download

My Documents

Store, email, and share your favorite documents.

View My Documents