Is a main terminal box required for MP Meter-Pak Meter Centers?

Issue:
Current Product Design

Product Line:
MP Meter Pak Metering

Evnironment:
Product requirements

Cause:
Product installation

Resolution:
The Meter Pak Meter centers are all Self-contained metering devices and the Main Lugs Termination point is an integral part of the MP device. Therefore, NO separate terminal box would be required. 