Technical FAQs

Ask a Question

Do we offer 400A EZM with bolt on meter capability?

Issue:
A bolt on meter is required by specification.

Product Line:
EZM

Environment:
EZM metering requirements 

Cause:
Utility company requirement calls for bolt on meter.

Resolution:
Yes, we do. EZMK (catalog number prefix) is available in 1 PH In/1 PH Out, 3 PH In/1 PH Out and 3 PH In/3 PH Out. Available in 1 or 2 meter socket arrangements. Refer to the latest Schneider Electric Digest for selection. 


 

Was this helpful?
What can we do to improve the information ?